Shell Cove Club House

Case Study

Shell Cove Club House

Clubhouse alterations and additions — concept to DA stormwater design

Shell Cove Commercial / Alterations & Additions Concept to DA
Location
Shell Cove
Council
Shellharbour City Council
Project type
Commercial / Alterations & Additions
Approval pathway
Concept to DA

Services provided

  • Concept stormwater assessment
  • DA stormwater management plan
  • OSD design
  • Drainage design

Engineering challenge

The clubhouse alteration and addition required a stormwater management plan that addressed both the new works and the existing drainage infrastructure, within the constraints of the existing building footprint and Council's stormwater requirements.

CATES solution

CATES prepared a concept stormwater assessment to identify constraints and inform the design, followed by a full DA stormwater management plan including OSD sizing and drainage design.

Outcome

DA stormwater documentation prepared and submitted with the development application.

Have a similar project?

Contact CATES to discuss your engineering requirements.

Get in touch